We have delivered a vast array of projects in both secondary and primary education facilities accommodating most works during school holidays with emergency works carried out prior to or at the end of the school day
This was a joint venture with Crunch Accounting to update and modernise the reception space. We changed the layout of the floor incorporating more practical materials, refurbished the desk, wallpapered the walls and updated the lighting including some extra little touches here and there. To accommodate the working week all works were carried out during a 48hr period.
Stud wall built with matching oak door incorporating obscure glass panel, bespoke shelving and storage space.
Rear of property pre-fabricated extension with complete internal modernisation, installation of a bespoke kitchen shipped in from Germany, three new fully tiled designer bathrooms, remote roof lights, all external windows and doors replaced with high quality bespoke (again from Germany) velfac double glazing, new flooring throughout and much more - this project was delivered in close collaboration with both the architect and designer.